Welcome to the before, during and after pictures of our recent remodeling. This remodeling occurred in two phases. The first phase was completed before the Christmas holiday, 2010. It consisted of the Hall light, Guest bathroom, Day bedroom and Guest bedroom. Phase two started after the holidays and completed in February, 2011. It consisted of the Master bedroom and Master bathroom. The ceilings went from 'popcorn' to 'knockdown' texture; the walls went from textured to smooth; the lighting in the bedrooms was replaced; the carpet in the bedrooms was replaced; the vinyl flooring in the bathrooms was replaced with tile; and the bathroom sink faucets were replaced. The ceilings are now Dover white and the walls are Napery yellow. Additionally, the closet doors were replaced (check out the new mirrored closet doors). Enjoy the pictures !


