Thursday, March 31, 2011

Welcome to the before, during and after pictures of our recent remodeling. This remodeling occurred in two phases. The first phase was completed before the Christmas holiday, 2010. It consisted of the Hall light, Guest bathroom, Day bedroom and Guest bedroom. Phase two started after the holidays and completed in February, 2011. It consisted of the Master bedroom and Master bathroom. The ceilings went from 'popcorn' to 'knockdown' texture; the walls went from textured to smooth; the lighting in the bedrooms was replaced; the carpet in the bedrooms was replaced; the vinyl flooring in the bathrooms was replaced with tile; and the bathroom sink faucets were replaced. The ceilings are now Dover white and the walls are Napery yellow. Additionally, the closet doors were replaced (check out the new mirrored closet doors). Enjoy the pictures !

Here are the before and after pictures of the Hall light:

The Guest Bathroom before the remodel:



The Guest Bathroom during the remodel:



The Guest Bathroom after remodeling:




Here is the one picture I have of the Day Bedroom before remodeling:

The Day Bedroom under construction:


Come look into the finished Day Bedroom:



Here is what the Guest Bedroom looked like prior to remodeling:




Here is the Guest Bedroom under construction:





The Guest Bedroom after remodeling:




Here is how the Master Bedroom looked prior to the remodeling:



Master Bedroom under construction:



It is really nice to have the Master Bedroom back !: